Let’s face it, the current system of adding an anchor bolt to an existing base plate is flawed. Too often the process can take long to complete.
Traditionally one threads an anchor bolt through a hex nut into the drilled hole while the epoxy is added. If you aren’t fast enough the epoxy can set before the anchor is properly installed – which leads to performance failures.
No one wants performance failures on any job, that’s why the Allfasteners team created the innovative solution known as the split nut.
The split nut addresses difficult field situations with streamlined innovation – by eliminating the need to thread an entire anchor bolt through the nut.
Split nuts are just that, split. Two equal halves allow the nut to move along the anchor bolt without ever turning. Just watch this 3D rendering of the split nut in action and witness the ease of installation.
The split nut was designed to provide the market with a solution to speed up time on the jobsite. Accompanied by four structural bolts that can be tightened with ease – it does just that and more. In fact the split nut offers a wide range of benefits including:
Being able to align the nut to any position on the rod will save you a lot of time to complete other tasks – and saved time equals saved money.
To inquire about one of Allfasteners most innovative solutions – the split nut – simply contact one of our knowledgeable representatives. Always willing to help answer any questions you may have; our team can be contacted by phone or via email. Just call 888.859.6060 or fill out our contact us form.
Comments